Ross solution projects installed a new tarmac and resin bound surface in Lewisham, London. The driveway, footpaths and car parks were transformed through mixing aggregates and resin together and then spreading over the carefully prepared base.
The work was completed on time in a period of 4 weeks, and was given a high quality finish. From the project, we gained a fantastic relationship with a new client, through working closely with them every step of the way.